The Polk County Highway Department has announced the following County Roads will be under construction during the 2021 construction season.
CSAH 6 – Bituminous Overlay from CSAH 33 to CSAH 75
CSAH 6 – Bituminous Overlay from Highway 92 to CSAH 75
CSAH 6 – Bituminous Overlay from Fosston to CSAH 3
CSAH 11 – Bituminous Overlay from Crookston to CSAH 46
CSAH 11 – Reconstruction from North Broadway to the east city limits of Crookston
CSAH 57 – Grading and Bituminous Surfacing from Highway 75 to east county line
CSAH 1 – Bridge reconstruction located .72 miles east of Highway 32
CSAH 1 – Bridge reconstruction located 5.2 miles east of Highway 32
CSAH 29 – Stabilized Aggregate Base located from CSAH 9 to east county line
CR 201 – Stabilized Aggregate Base located from Highway 2 to Lengby
The public is asked to avoid these construction projects by utilizing alternate routes of travel if at all possible. The traveling public’s cooperation during this construction will be appreciated.
Anyone desiring further information should contact the Polk County Highway Department in Crookston at 218-281-3952.





