ADVERTISE WITH US | EMAIL: KROX@RRV.NET

POLK COUNTY HIGHWAY DEPARTMENT ANNOUNCES 2021 ROAD CONSTRUCTION PROJECTS

The Polk County Highway Department has announced the following County Roads will be under construction during the 2021 construction season.

CSAH 6 – Bituminous Overlay from CSAH 33 to CSAH 75

CSAH 6 – Bituminous Overlay from Highway 92 to CSAH 75

CSAH 6 – Bituminous Overlay from Fosston to CSAH 3

CSAH 11 – Bituminous Overlay from Crookston to CSAH 46

CSAH 11 – Reconstruction from North Broadway to the east city limits of Crookston

CSAH 57 – Grading and Bituminous Surfacing from Highway 75 to east county line

CSAH 1 – Bridge reconstruction located .72 miles east of Highway 32

CSAH 1 – Bridge reconstruction located 5.2 miles east of Highway 32

CSAH 29 – Stabilized Aggregate Base located from CSAH 9 to east county line

CR 201 – Stabilized Aggregate Base located from Highway 2 to Lengby

The public is asked to avoid these construction projects by utilizing alternate routes of travel if at all possible. The traveling public’s cooperation during this construction will be appreciated.

Anyone desiring further information should contact the Polk County Highway Department in Crookston at 218-281-3952.

Share:
Tags: , ,
Scroll to Top
Skip to content