According to the Polk County Highway Department, the following County Roads will be under construction during the 2025 construction season.
CSAH 6 Bituminous Overlay located from CSAH 3 (2 miles North of Fosston) to Highway 92
CSAH 9 Hot-in-Place Recycling located from the Red River to Highway 75 in Crookston
CSAH 12 Grade widening and Aggregate Shouldering located from TH 32 in Fertile to CSAH 41
CSAH 13 Bituminous Overlay located from CSAH 11 (4 miles East of Crookston) to CSAH 17
CSAH19 Hot in-Place recycling located from Highway 75 at Euclid to CSAH 10 in Clearwater County
CSAH 21 Bituminous Overlay located from Highway 75 (3 miles North of Euclid) to East County Line
CSAH 45 Hot in-Place recycling located from Highway 32 to CSAH 12 in Mentor
CSAH 46 Bituminous Surfacing located from Highway 102 to Highway 2 (6 miles east of Crookston)
CSAH 49 Bituminous Overlay located from Highway 32 at Marcoux to CSAH 12
CSAH 66 Bituminous Overlay located from CSAH 21 to North County Line
CSAH 48 Stabilized Aggregate Base located from CSAH 51 to Highway 102
CSAH 51 Stabilized Aggregate Base located from Highway 9 to CSAH 44
The public is asked to avoid these construction projects by utilizing alternate routes of travel if at all possible. The traveling public’s cooperation during this construction will be appreciated.
Anyone desiring further information should contact the Polk County Highway Department in Crookston at 218-281-3952.
