Skip to content

ADVERTISE WITH US | EMAIL: KROX@RRV.NET

Polk County Highway Department releases list of 2025 County Road construction projects

According to the Polk County Highway Department, the following County Roads will be under construction during the 2025 construction season.

CSAH 6           Bituminous Overlay located from CSAH 3 (2 miles North of Fosston) to Highway 92

CSAH 9           Hot-in-Place Recycling located from the Red River to Highway 75 in Crookston

CSAH 12         Grade widening and Aggregate Shouldering located from TH 32 in Fertile to CSAH 41

CSAH 13         Bituminous Overlay located from CSAH 11 (4 miles East of Crookston) to CSAH 17

CSAH19          Hot in-Place recycling located from Highway 75 at Euclid to CSAH 10 in Clearwater County

CSAH 21         Bituminous Overlay located from Highway 75 (3 miles North of Euclid) to East County Line

CSAH 45         Hot in-Place recycling located from Highway 32 to CSAH 12 in Mentor

CSAH 46         Bituminous Surfacing located from Highway 102 to Highway 2 (6 miles east of Crookston)

CSAH 49         Bituminous Overlay located from Highway 32 at Marcoux to CSAH 12

CSAH 66         Bituminous Overlay located from CSAH 21 to North County Line

CSAH 48         Stabilized Aggregate Base located from CSAH 51 to Highway 102

CSAH 51         Stabilized Aggregate Base located from Highway 9 to CSAH 44

The public is asked to avoid these construction projects by utilizing alternate routes of travel if at all possible. The traveling public’s cooperation during this construction will be appreciated.

Anyone desiring further information should contact the Polk County Highway Department in Crookston at 218-281-3952.

Share:
Tags: , , , , , , , , , , , , , ,