POLK COUNTY HIGHWAY DEPARTMENT ANNOUNCES 2019 CONSTRUCTION PROJECTS

According to the Polk County Highway Department, the following County Roads will be under Construction during the 2019 construction season.

CSAH 3     Grading, Bituminous Overlay and Aggregate Shoulders located from CSAH 30, 2.0 miles north of Fosston, MN to the East County Line

CSAH 10    Bituminous Overlay and Curb and Gutter located at Maple Lake East Shore.

CSAH 24   Bituminous Overlay and Aggregate Shoulders located from TH 2 to CSAH 27, 7.0 miles east of Fosston, MN

CSAH 36    Bituminous Overlay and Bituminous Shoulders located from CSAH 42 to CSAH 34, 5.0 miles south of Erskine, MN

CSAH 41   Bituminous Overlay and Bituminous Shoulders located from CSAH 42 to CSAH 34, 3.0 miles south of Erskine, MN

CSAH 42   Bituminous Overlay and Bituminous Shoulders located from CSAH 42 to CSAH 41, 7.0 miles south of Erskine, MN

CSAH 61/ CSAH 111    Bituminous Overlay and Handicap ramps located in Fisher, MN

CSAH 115    Bituminous Overlay located in Fosston, MN

CR 210         Bituminous Surfacing for 500’ at BNSF Railroad tracks

CSAH 44     Stabilized Aggregate Base located from TH 102 to CSAH 45

CSAH 45     Stabilized Aggregate Base located from TH 9 to CSAH 44

CR 228        Stabilized Aggregate Base located from TH 102 to TH 2

The public is asked to avoid these construction projects by utilizing alternate routes of travel if at all possible.  The traveling public’s cooperation during this construction will be appreciated.

Anyone desiring further information should contact the Polk County Highway Department in Crookston at 281-3952.